Flexible Capacity (aka 
Flexible Capacity and Local Reliability Resource Retention)<span class=" width="600" />

Flexible Capacity (aka 
Flexible Capacity and Local Reliability Resource Retention)

A tariff mechanism developed by the CAISO to provide supplemental compensation to designated generation assets that are deemed essential to statewide electric reliability. The Flexible Capacity and Local Reliability Resource Retention (FLRR) was designed as a stop-gap measure, enabling uneconomic generation units that would otherwise…

Continue reading →

Renewables Integration<span class=" width="600" />

Renewables Integration

Deploying and operating enough flexible, controllable resources to ensure grid reliability given the variability and uncertainty associated with intermittent renewable power generation. [Source: California Energy Commission (CEC) Website: http://www.cpuc.ca.gov/PUC/energy/Renewables/hot/Renewable+Integration.htm]