Electric power that can be quickly ramped up and down as needed to maintain electric grid stability. [Source: California Independent System Operator Corporation Docket No. ER13-550- 000 Flexible Capacity and Local Reliability Resource Retention Proposal, filed with the Federal Energy Regulatory Commission on December 12, 2012.]